Cana Road Residence, Chico CA

This beautiful home Was planned for Radiant heat in the floor. The concrete had color mixed in the load. UN-fortunately the Concrete contractor forgot to tie down the PEX tubes before pouring the slab. The PEX tubes floated to the top and caused severe cracking. Our solution was to use multiple crack and chip repair techniques. The images will show you how severe the damage was and how well the floor and crack repair is holding up 5 years after the work was done.